Four key elements need to be verified during implementation:
Product Quality Review: Verify the compatibility between design documents and production processes, and confirm the completeness of inspection guidelines.
Material Qualification Review: Test the physicochemical properties of raw materials, trace supplier factory inspection records, and conduct a comprehensive review in conjunction with customer technical documents.
Production Technology Standard Review: Assess the rationality of process parameter settings and confirm the validity of new process validation reports (applicable to initial supplier deliveries, significant changes in product design/structure, or major adjustments to production processes).
Critical Component Inspection: Verify whether the production, design, and supply concepts meet requirements based on the bill of materials and drawing specifications. This is typically applied during initial assembly, critical component receipt, technical changes, or periodic audits.